| Feature | What it does | Coded | Deploy status | Bottleneck / gate |
|---|
| ⬜ | Supervisor task list | One list of what each supervisor is working on: people issues, reviews, coaching, corrective actions, statements, drawings, material and floor issues. | Planned/stub | Planned | Not started — needs spec + API + DB |
| ⬜ | People / issues clock-in | Supervisors clock onto a people or floor issue like a task, so time spent is captured, not guessed. | Planned/stub | Planned | Not started — needs spec + API + DB; APS optional/off until HR ready — supervisor pilot runs without live APS |
| ⬜ | Tier 1 / Tier 2 meetings + team attendance | Log Tier 1/Tier 2 meetings and take team attendance in one tap. | Planned/stub | Planned | Not started — needs spec + API + DB; APS optional/off until HR ready — supervisor pilot runs without live APS |
| ⬜ | Kiosk / unit walk scans | Scan the kiosk or unit QR on a walk — proves the floor was walked and when. | Planned/stub | Planned | Not started — needs spec + API + DB |
| ⬜ | Management dashboard | Shows management what every supervisor is working on and how hard: open items, time per category, walks, meetings, attendance. | Planned/stub | Planned | Not started — needs spec + API + DB |
| ⬜ | Manager dashboard + leaderboards | Ops view above supervisors: all shifts/departments, supervisor and crew rankings, handoff success, attendance, throughput, QC pass/fail checks with alerts, safety TRIR (Total Recordable Incident Rate), and Kaizens (improvement ideas submitted vs completed). | Planned/stub | Planned | Not started — needs live labor/attendance + QC + safety incident + Kaizen metrics + management dashboard + persistent store (Neon) |
| ⬜ | Executive dashboard + leaderboards | High-level KPIs and rankings across projects and departments: throughput, labor cost, on-time units, QC pass rate with alerts, safety TRIR (Total Recordable Incident Rate), and Kaizens (improvement ideas submitted vs completed). | Planned/stub | Planned | Not started — needs live labor/attendance + QC + safety incident + Kaizen metrics + management dashboard + persistent store (Neon) |
| ⬜ | Product acceptance testing | QA / acceptance tests on each finished product or unit before ship or hand-off: checklist, pass/fail, sign-off, and failures fed to QC alerts on the Manager/Executive dashboards. | Planned/stub | Planned (future) | Not started — needs acceptance checklists/test specs + QC data model + persistent store (Neon) |
| ⬜ | Supervisor shift handoff | Outgoing supervisor hands the next shift (day ↔ night; 6 day + 4 night supervisors) a single handoff packet. | Planned/stub | Planned | Not started — needs shift-aware handoff UI + persistent store (Neon) |
| ⬜ | Handoff packet contents | Open issues, people notes, materials, drawings, meetings, attendance flags, time-on-task clocks, unit status. | Planned/stub | Planned | Not started — needs shift-aware handoff UI + persistent store (Neon) |
| ⬜ | Incoming acknowledgement | Incoming supervisor reviews and confirms receipt; unacknowledged items stay flagged. | Planned/stub | Planned | Not started — needs shift-aware handoff UI + persistent store (Neon) |
| ⬜ | Handoff success dashboard | Management + yard dashboards show each shift handoff: ✅ acknowledged vs ⚠️ not addressed / missed, by supervisor and shift. | Planned/stub | Planned | Not started — depends on Supervisor shift handoff + persistent store (Neon); management dashboard also Planned |
| ⬜ | Master planner interface | One place for the schedule across units/projects, materials demand, capacity, and shift handoff visibility. | Planned/stub | Planned | Not started — needs schedule + inventory + persistent store (Neon) |
| Feature | What it does | Coded | Deploy status | Bottleneck / gate |
|---|
| 🟡 | Unit dashboard | Where each unit stands | Partial | Live shell | UI shell only — no persistent API |
| 🟡 | Crew cycle | Rotation at a glance | Partial | Live shell | UI shell only — no persistent API |
| 🟡 | Task bars | Progress per task | Partial | Live shell | UI shell only — no persistent API |
| 🟡 | QR menu | Scan to open any app | Partial | Live shell | UI shell only — no persistent API |
| ⬜ | Global leaderboard | Level 1 of 3: floor-wide rankings of crews, teams, and supervisors on a kiosk display. | Planned/stub | Planned | Not started — needs live labor/attendance metrics + persistent store (Neon) |
| ⬜ | Project-level leaderboard | Level 2 of 3: rankings within one project (all units on that job). | Planned/stub | Planned | Not started — needs live labor/attendance metrics + persistent store (Neon) |
| ⬜ | Department-level leaderboard | Level 3 of 3: rankings within one department/shop — e.g. Metal Fab (every frame going through Metal Fab), Concrete Casting (every building/unit being cast), or Prefab (every prefab unit). | Planned/stub | Planned | Not started — needs live labor/attendance metrics + persistent store (Neon) |
| Feature | What it does | Coded | Deploy status | Bottleneck / gate |
|---|
| 🟡 | Job cost / WIP | Live labor + material cost per unit | Partial | Live (pilot, in-memory) | Neon/Postgres not live (in-memory only) |
| 🟡 | Inventory | Locations, bins, quantities | Partial | Live (pilot, in-memory) | Neon/Postgres not live (in-memory only) |
| 🟡 | Reorder | Min/max, reorder point, suggested PO | Partial | Live (pilot, in-memory) | Neon/Postgres not live (in-memory only) |
| 🟡 | Multi-level BOM | Subassemblies, revisions, backflush | Partial | Live (pilot, in-memory) | Neon/Postgres not live (in-memory only) |
| ⬜ | Scanco-grade scanning | Scanning built in | Planned/stub | Planned | Scanner hardware/SDK integration not built |
| 🟡 | Accounting depth | GL-ready job cost, WIP, COGS, variance — Sage-or-better | Partial | In build | Code in progress — not finished/tested |
| 🟡 | Audit trail | Every record change is logged with who, when and why; corrections need a reason; soft delete with restore. | Partial | Live (pilot, in-memory) | Neon/Postgres not live (in-memory only) |
| ⬜ | Autodesk Vault ↔ warehouse part link | Links Autodesk Vault part numbers (CAD/docs) to warehouse inventory SKUs so one Vault part = one warehouse SKU across projects; feeds the common-part reorder rollup. | Planned/stub | Planned | Not started — needs Autodesk Vault API/credentials + persistent warehouse inventory + persistent store (Neon) |
| Feature | What it does | Coded | Deploy status | Bottleneck / gate |
|---|
| 🟡 | Workload time tracking | Workload tab clocks supervisor time spent on people, issues, and tasks (like a task clock). | Partial | On Origin main (not yet confirmed on CF) | On Origin main, not redeployed to CF; time summary/report view is a stub |
| 🟡 | Security watchdog | Monitors access/security events with accuracy log. | Partial | On Origin main (not yet confirmed on CF) | On Origin main, not redeployed to CF |
| ⬜ | Conversational floor assistant | Chat-driven CRM over floor data. | Planned/stub | Planned | Not started — needs persistent DB + chat API |
| ⬜ | Common-part demand rollup | One SKU across projects: schedule demand − on-hand − on-order + lead time → buy qty + date alert. | Planned/stub | Planned | Needs schedule + BOM data persisted (Neon/Postgres not live) |
| Feature | What it does | Coded | Deploy status | Bottleneck / gate |
|---|
| ⬜ | Sage/Scanco: Materials / items | Two-way import/export | Planned/stub | Stub (file import/export, not sent) | Sage 100 credentials / bridge not wired (file only) |
| ⬜ | Sage/Scanco: Work tickets | Two-way import/export | Planned/stub | Stub (file import/export, not sent) | Sage 100 credentials / bridge not wired (file only) |
| ⬜ | Sage/Scanco: Labor QR → task scans | Two-way import/export | Planned/stub | Stub (file import/export, not sent) | Sage 100 credentials / bridge not wired (file only); APS optional/off until HR ready — supervisor pilot runs without live APS |
| ⬜ | Sage/Scanco: All timeclock data | Two-way import/export | Planned/stub | Stub (file import/export, not sent) | Sage 100 credentials / bridge not wired (file only); APS optional/off until HR ready — supervisor pilot runs without live APS |